Talent.com
Skyward Consultancy
MATRIAL CONTROLLER (PLANT MATERIAL MANAGEMENT)Skyward Consultancy • Qatar
البحث عن وظائف أخرى
MATRIAL CONTROLLER (PLANT MATERIAL MANAGEMENT)

MATRIAL CONTROLLER (PLANT MATERIAL MANAGEMENT)

Skyward Consultancy • Qatar
منذ أكثر من 30 يومًا
الوصف الوظيفي

Position : MAETRIAL CONTROLLER (PLANT MATERIAL MANAGEMENT)

Education: Graduate (science / arts / commerce), computer knowledge English must

Experience: Min +10 years in applicable field

  1. Co-ordination with client logistic department to know materials arrival date/ time etc.
  2. Must have Knowledge about all mechanical, Piping and electrical items
  3. Organization of material storage area ( Laydown) and marking the location to stack

The materials for easy traceability.

4. Material Receipt: Checking of Container condition, packing list, packing number,

Number of packages inside the container and package condition. Availability of documents and certificates.

5. After off loading checking of qty / quality (consumables)of materials received as per

Packing list and specification/ color code etc.

  1. Preparation of MRR (Material Receiving Report) and arrangement of QA/QC inspection/client inspection if required.
  2. Preparation of OSD (Overage, Shortage, Damage) and submission to client with photograph.
  3. Material stacking according to vender instruction manual indoor/outdoor. Hazardous materials stacking with MSDS in separate place as per safety requirement.
  4. Arrangement and segregation of materials and placing in designated area/place.
  5. Periodical Preservation of equipment and its spares such as Pump, Motor etc.
  6. Material Issues according to MIV (Material Issue Voucher) as per construction team requirement with approval of concern manager/engineer.
  7. Stock Ledger preparation according to client requirement/site management.
  8. Data Entry for Receipt and Issue to site and other agencies.
  9. Submission of material Receipt / Issue / Balance to client if required by client.
  10. Preparation of MRV ( Material Return Voucher) if material returned from site due to

Modification etc.

15. Handover of Surplus materials/Iron Scrap/Electrical cable and operation spares after

Completion of the project.

16. Maintaining in order and housekeeping of the ware house / laydown/ material yard.

17. Overall supervision of material co-ordination/monitoring arrival/dispatch etc.


Education
Bachelor of Science (B.Sc), Bachelor of Commerce (B.Com), Bachelor of Arts (B.A)
Skills Required
Osd

إنشاء تنبيه وظيفي لهذا البحث

MATRIAL CONTROLLER (PLANT MATERIAL MANAGEMENT) • Qatar