The resource shall be able to perform naval analysis for installation operation not limited to : Mooring analysis; engineered lifting / upending analysis; transportation analysis; floatover analysis; Hydrodynamic database calculation.
Minimum of 5 years in Installation analysis for offshore sector
Masters degree in Naval Architecture
Mandatory software : Moses Gmoor Orcaflex Mathcad
Nice to Have : Python
Employment Type : Full Time
Experience : years
Vacancy : 1
#J-18808-Ljbffr
Architect • Doha, Qatar