Overview

UTILITIES ENGINEER / SPECIALIST - OSBL

Project : Major Petrochemicals Project - Ethylene Unit

Position Type : Project-Based Role - Utilities / OSBL

Location : Project Site Offices - Middle East Region

Reporting To : OSBL Superintendent

Role Context : Member of the Project Management Team (PMT)

Role Summary :

Serve as a Process / Facilities Engineer supporting the Utilities Operations team from early pre-commissioning through mechanical completion. This role is critical to ensuring a safe, efficient, and on-time startup of utility systems and a smooth transition to stable plant operations.

Project Objective :

Achieve safe, on-schedule, and on-budget startup of new utility systems that meet performance targets, deliver on-spec products, and reach design operating rates—meeting or exceeding financial and operational expectations established during project approval.

Health, Safety & Environmental (HSE) Goals :

Applies to all phases of the project :

  • Zero injuries
  • Zero vehicle-related incidents
  • Zero property damage
  • Zero reportable environmental events during construction and startup

Key Responsibilities :

Commissioning & Handover Support :

  • Collaborate with engineering and construction teams to resolve field issues during commissioning.
  • Lead and support system handover efforts for both process and non-process systems, including :
  • Telecommunications
  • Substations / Remote Instrument Enclosures / Analyzer Houses
  • Fire & Gas Systems, Public Address and General Alarm (PAGA), Emergency Alert Systems (EAS)
  • Distributed Control Systems (DCS) / Safety Instrumented Systems (SIS)
  • Lead Process Safety Startup Reviews (PSSRs) for more than 130 utility systems.
  • Support additional scope nearing mechanical completion to manage PSSR workload.
  • Provide practical, field-based solutions during early utilities commissioning and operations, including managing MOCs (Management of Change) and temporary installations.
  • Project Interface & Continuity :

  • Ensure smooth transition from project phase to commissioning and operations.
  • Interface with contractor engineering, construction, and operations support teams.
  • Review and validate system turnover packages for startup readiness.
  • Assist with development, tracking, and reporting of commissioning milestones.
  • Participate in pre-commissioning and commissioning coordination meetings.
  • Safety & Compliance :

  • Promote and uphold key safety principles and expectations, including :
  • Life-Saving Rules
  • Operational Discipline
  • Stop Work Authority
  • Incident reporting and root cause investigations
  • Environmental regulatory compliance
  • Execute MOC and PSSR processes in line with company standards.
  • Validate all safety and environmental systems before plant startup.
  • Operational & Fiscal Responsibilities :

    Fiscal Responsibility :

  • Ensure adequate resource planning for commissioning and startup.
  • Participate in the transition of Care, Custody, and Control, including EHS responsibilities.
  • Integrate SIMOPs (Simultaneous Operations) planning with commissioning.
  • Lead electrical and systems energization planning.
  • Operational Excellence :

  • Implement HSE initiatives throughout the commissioning lifecycle.
  • Ensure alignment of operations and maintenance deliverables with corporate and project standards.
  • Manage adherence to project procedures, PSM (Process Safety Management), and OE (Operational Excellence) frameworks.
  • Apply lessons learned from prior similar projects.
  • Construction, Commissioning & Startup Phase :

  • Develop strategies and procedures for utilities commissioning and startup.
  • Coordinate vendor support needs with construction and operations leadership.
  • Manage manpower planning for commissioning and startup.
  • Monitor progress and report status to leadership.
  • Support a safe system and plant startup and post-startup stabilization.
  • Troubleshoot system issues and drive optimization.
  • Ensure environmental requirements are met during commissioning and early operations.
  • Quality Targets :

    Ensure all systems and units are commissioned safely, meet performance specifications, achieve design throughput, and are completed within schedule.

    Post-Startup Support :

  • Participate in lessons learned reviews.
  • Support performance testing and third-party verification, including tests required for financial or lender approvals.
  • Teamwork & Culture :

  • Encourage a culture that values individual contributions and team collaboration.
  • Promote respect, inclusion, accountability, and open communication.
  • Support a tolerant and professional workplace environment.
  • Required Experience & Attributes :

  • Minimum 5 years of relevant industry experience.
  • Self-motivated and proactive with a solutions-focused mindset.
  • Capable of handling complex workloads in a fast-paced, safety- and schedule-driven project environment.
  • End of Description

    #J-18808-Ljbffr

    Create a job alert for this search

    Project Management • Doha, Ad-Dawhah, Qatar